Kwakiutl Wagalus School Port Hardy, BC

Info

LTA was selected as the successful proponent in a competitive RFP process for the Feasibility Study stage and completed the Feasibility Study in spring 2013 with approval by Kwakiutl Band Council and Aboriginal Affairs and Northern Development Canada (AANDC). Since then LTA has completed full design and preparation of Construction Contract Documents and the lowest Tender for the school came in below budget. Construction is starting this fall.

The project is a K-Grade 7 school. Multiple design charrettes with the Kwakiutl community throughout the schematic design and design development phases helped to develop the form and plan of the school. Even the future students were involved in the design charrettes and show great enthusiasm about their new school. This process is very important to Kwakiutl because they want to ensure the transfer of historical value. For example the entry canopy is designed as a teaching tool representing the traditional framing and structure of their historical buildings and the heart of the school is the multi-purpose cultural room that is intended to be a modern interpretation of Kwakiutl's traditional Big House.

In order to simplify and economize the construction of the large gymnasium it is designed as an all wood, prefabricated system that will be manufactured off site complete with interior and exterior finishes and all installations within each 8 ft panel. On site it will simply be erected by a small crew.

Details

  • Client:Kwakiutl First Nation
  • Type:
  • Size:1,637m² (17,620ft²)
  • Status:Completed 2016
Index

Kwakiutl Wagalus School

ImagesInfo

Kwakiutl Wagalus School

Port Hardy, BC

LTA was selected as the successful proponent in a competitive RFP process for the Feasibility Study stage and completed the Feasibility Study in spring 2013 with approval by Kwakiutl Band Council and Aboriginal Affairs and Northern Development Canada (AANDC). Since then LTA has completed full design and preparation of Construction Contract Documents and the lowest Tender for the school came in below budget. Construction is starting this fall.

The project is a K-Grade 7 school. Multiple design charrettes with the Kwakiutl community throughout the schematic design and design development phases helped to develop the form and plan of the school. Even the future students were involved in the design charrettes and show great enthusiasm about their new school. This process is very important to Kwakiutl because they want to ensure the transfer of historical value. For example the entry canopy is designed as a teaching tool representing the traditional framing and structure of their historical buildings and the heart of the school is the multi-purpose cultural room that is intended to be a modern interpretation of Kwakiutl's traditional Big House.

In order to simplify and economize the construction of the large gymnasium it is designed as an all wood, prefabricated system that will be manufactured off site complete with interior and exterior finishes and all installations within each 8 ft panel. On site it will simply be erected by a small crew.

Details

  • Client Kwakiutl First Nation
  • Size 1,637m² (17,620ft²)
  • Status Completed 2016

Program

  • K to Grade 7 School with full size gymnasium, multi-purpose cultural room and library plus necessary support functions including teacher resource room and staff rooms.

Features

  • Gymnasium walls designed as an all wood structure pre-fabricated system that will be constructed in 8ft panels complete with interior and exterior finishes and all installations and then transported to site.